About required run rate calculator
The required run rate (RRR) is the pace a chasing team must score to reach the target before the overs run out.
Formula
RRR = runs still needed ÷ overs left. Needing 72 from 8 overs is 9.0 an over.
Reading the match
Compare it with the current run rate. If the required rate keeps rising, the team needs bigger overs and boundaries.
A worked example
Chasing 168, a team has 90 after 10 overs and needs 78 from 10 overs, a required rate of 7.8. If it scores 5 in the next over, it must then average 8.1 over the last 9 overs, as 73 ÷ 9 = 8.11.
Reading the pressure
When the required rate climbs above the team's current rate for several overs, batters have to take more risks, which tends to cost wickets.